Skip to main content

Kicking Horse Canyon Project Phase 4 construction will require extended multi-day closures of the Trans-Canada Highway (TCH) east of Golden during fall and winter. This September, October, and November extended closures will be in effect. The highway will be reopened at 6 a.m. on December 1st.

The construction activities that will be carried out cannot be performed safely in the presence of traffic or during shorter interruptions.  During these periods, Trans-Canada Highway traffic will be routed via Highways 93S and 95, which will add up to 90 minutes to travel time.

Extended closure dates:

  • 12 p.m. on Sept 20th to 12 p.m. on Sept 24th (MDT)
  • 12 p.m. on Sept 27th to 12 p.m. on Oct 8th (MST)
  • 12 p.m. on Oct 12th to 6 a.m. on Dec 1st (MST)

Please note there will be no closures or stoppages due to construction during the Thanksgiving holiday weekend, from Friday, Oct 8th at 12 p.m. (MDT) until Tuesday, Oct 12th at 12 p.m. (MDT).

 

Please check DriveBC for the most up to date information.

Feature Image
Newsletter Issue
Weight
0
Section
feature on advocacy and policy
No
Featured post
No
Publish on homepage
Off
Feature on "Incase You Missed It" Section of The Bulletin
Off