The Kicking Horse Canyon Constructors (KHCC) will be implementing intermittent lane closures, overnight full closures and extended (multi-day) road closures on the Trans-Canada Highway for the Kicking Horse Canyon Phase 4 construction through September.
You can visit the Project’s highway status calendar for September 2023 traffic closures and ongoing schedules here.
Extended Closures
The Project will also require extended multi-day closures of the Trans-Canada Highway (TCH) east of Golden during the fall 2023 season during the following times.
- September 18, 2023 at 12:00 noon to September 22, 2023 at 12:00 noon
- September 25, 2023 at 12:00 noon to October 6, 2023 at 12:00 noon
The alternative traffic route is via Highway 93S and Highway 95, with an additional driving time of approximately 1.5 hours. Roadside signage will provide advance notification of the closure and alternative routes.
Both approaches to Kicking Horse Canyon will be well-signed and traffic control personnel will be onsite to direct traffic as required. Drivers are reminded to obey construction-zone speed limits and the direction of traffic control personnel.
Please refer to DriveBC for the most up-to-date travel information.