Royal Avenue on-ramp: On May 16 and 27, the Royal Avenue on-ramp will be temporarily closed for two hours between 10 pm and 5 am for utility investigation work. When the Royal Avenue on-ramp is closed, drivers will be directed to use the Columbia Street loop-ramp via McBride Boulevard. Detour signage will be in place.
Drivers travelling southbound on the Bridge Connector will also notice construction activities where the Royal Avenue on-ramp and Bridge Connector merge. Drivers are asked to obey speed limits and instructions of traffic control personnel.
Daily Columbia Street loop-ramp closure: On select evenings between May 16 and 27, the Columbia Street loop-ramp daily 3 pm. to 6 pm closure will be extended by one hour, such that the loop-ramp will be closed to traffic until 7 pm.
During the loop-ramp closure, trucks are asked to follow detour signs and use Braid Street.
If you have any questions about this work, please email info@fcgp.ca or call the 24/7 construction information phone line: 1-844-815-6149.
Highway 91/17 Upgrade Project
The Highway 91/17 Upgrade Project (“Project”) is underway. In order to accommodate this work, please be advised of the following activities and roadway changes in these key locations:
- Highway 91C/Highway 17
- Highway 17/River Road
- Highway 17/80 Street
- Highway 91C/Weigh Scale
- Highway 91/Nordel Way Interchange Improvements
- Pile Driving Activities
If you have any questions about this project, please contact the Highway 91/17 Upgrade Project Team at info@pgcgp.ca.