Skip to main content

Work is currently underway on the Hwy 99 Bus-On-Shoulder Transit Lanes Project in Delta (Hwy 99 between Hwy 17A and 96 St.) and will be ongoing until July 2023.

There may be nightly lane closures on southbound Hwy 99 between Hwy 17A and 96 St. There is a low shoulder condition, with a corresponding speed reduction to 60km/h in place at all times through the work area. Please be aware that there will be trucks and heavy equipment working at night in the lane closure throughout this corridor.

The on-ramps to southbound Hwy 99 from Hwy 17 and Ladner Trunk Road have been temporarily shortened for construction. There is a new yield condition at the Hwy 17 ramp; please use caution while merging. This condition will be present for a few weeks until paving is completed.

Please drive carefully through the project corridor and be aware that the locations of signs and traffic devices may change frequently.

If you have any questions about this project, please contact M2K Construction Ltd.

Newsletter Issue
Weight
0
Section
feature on advocacy and policy
No
Featured post
No
Publish on homepage
Off
Feature on "Incase You Missed It" Section of The Bulletin
Off